Creation of a cofferdam to stop flow to the filtration plant’s aeration room. Vacuum truck removal of remaining water and grit to prepare surfaces for repair. Complete multi-level scaffolding system installed as working platform. Abrasive blasting and removal of all existing lead coatings prior to repair of the substrate. Deep and shallow spall repairs and crack injections to repair concrete prior to the application of a performance coating. Blasting and coating of all existing aeration piping. Exterior improvements including extensive masonry repair related to tuckpointing, brick replacement, stone replacement, and removal and replacement of an existing retaining wall. Installation of new HVAC exhaust fans and mechanics.
Feura Bush WTP Aeration Room Improvements

Location
Feura Bush, NY
Completion Date
6/30/2025
Architect / Engineer
CPL
Project Value
$2,716,080.00